Latest Projects

65 tons Steel Reels

Vietnam

Shipment of 65 tons steel reel ex. Vungtau to Johor.
Status: Archived
 Pavlodar Oil Chemistry Refinery Upgrading Project-Pavlodar, Kazakhstan – Early Phase Detail Engineering & Procurement, Phase 1 FEED & Phase 1 Detail Engineering & Procurement.

Kazakhstan

Production of Euro 4 (ecological class K-4) quality type for gasoline, and for diesel Euro5 (ecological class K-5) (summer and winter type), with the refinery capacity of 7 Mt/y.
Status: Archived
QA / QC Manager – Extentsion and refurbishment of current plant. Sinopec, Tianjin, China

China

QA QC Manager for extension of refinery and overseeing shut downs of existing plant,
Status: Active
Armada Kraken FPSO - North sea Field

United Kingdom

Leading piping Team for Topside Design Engineering from Oiltech Engineering -chennai
Status: Active
Petronas RAPID project

Malaysia

Install TI integrator for all EPCC in Rapid project
Status: Cancelled
Supervision of themocouple installation

Malaysia

Act as a team player for supervision of gayesco tube skin thermocouple installation during turnaround at Petronas Penapisan Melaka
Status: Archived

Connect With Oil & Gas, Power and Renewable Energy Professionals

Sign Up Now!